Monthly Archives: March 2013

Post

SYSTRA has won the contract to oversee the design and to supervise the construction of 1,000 km of high-speed railway – in Kazakhstan

SYSTRA has signed a contract with Kazakhstan Temir Zholy (KTZ) – the Kazakh Railway Authority to oversee the design and to supervise the construction of a high-speed rail line between the cities of Almaty and Astana. The contract was signed  on 5th March in Kazakhstan’s capital city of Astana by SYSTRA CEO Pierre Verzat, and […]